Ground-Mount Polycrystalline Panel Installation
Budget / Salary₹12,500–37,500
TypeFreelance project
LocationRemote
Posted2 hours ago
I have already sourced a full set of polycrystalline solar modules and related balance-of-system components; what I now need is an experienced crew who can take the project from “parts on pallets” to a fully functioning, ground-mounted array.
The site is a clear, level plot with easy equipment access. Engineering drawings, string layouts and inverter locations are complete, so the work is purely physical installation: setting posts, assembling the racking, mounting the modules, running DC wiring to the combiner, placing conduit to the inverter pad and finishing with a clean, professional cable management job.
Deliverables
• Ground-mount structure erected, square and plumb
• All polycrystalline panels securely fixed and torqued to spec
• DC strings wired, labelled and megger-tested for continuity/insulation
• Conduit run and trench back-filled to grade
• Final walk-through and hand-off with performance verification readings
You’ll need to supply your own tools, lifting gear and standard safety equipment; I will provide the modules, racking kit, wiring, junction boxes and inverter. If you can slot this job into your schedule within the next three weeks and have a track record installing ground arrays, let’s connect and lock in the dates.
The site is a clear, level plot with easy equipment access. Engineering drawings, string layouts and inverter locations are complete, so the work is purely physical installation: setting posts, assembling the racking, mounting the modules, running DC wiring to the combiner, placing conduit to the inverter pad and finishing with a clean, professional cable management job.
Deliverables
• Ground-mount structure erected, square and plumb
• All polycrystalline panels securely fixed and torqued to spec
• DC strings wired, labelled and megger-tested for continuity/insulation
• Conduit run and trench back-filled to grade
• Final walk-through and hand-off with performance verification readings
You’ll need to supply your own tools, lifting gear and standard safety equipment; I will provide the modules, racking kit, wiring, junction boxes and inverter. If you can slot this job into your schedule within the next three weeks and have a track record installing ground arrays, let’s connect and lock in the dates.
Apply on Freelancer →