Project Schedule Management Plan
Budget / Salary$10–30
TypeFreelance project
LocationRemote
Posted44 minutes ago
THESE PARTS NEED TO BE COMPLETED IN ONE DAY FROM WHEN I AWARD PROJECT,
NO AI SHOULD BE USED, the document will be check for ai detection using turnitin!
8. SCHEDULE MANAGEMENT
Responsible: Schedule Manager
8.1 Plan Schedule Management
Explain the methods and procedures for developing, monitoring and controlling the
project schedule. Define the scheduling approach, reporting frequency, units of
measurement and responsibilities.
8.2 Define Activities
Derive specific project activities from the WBS work packages. Ensure that each activity
represents identifiable work required to complete a work package.
8.2.1 Activity List
Prepare an activity list containing unique IDs, descriptions, assigned owners, durations
and relevant work package references.
8.2.2 Milestone List
Identify important project events and completion points. Include major planning,
development, testing, acceptance and closure milestones within the simulated four-
week project.
8.3 Sequence Activities
Identify the logical relationships and dependencies between project activities. Explain
which activities must precede or follow others.
8.3.1 Activity Dependencies
Document predecessor and successor relationships and identify dependency types
where appropriate.
8.3.2 Activity-on-Node Network Diagram
Develop a network diagram showing all relevant activities and their logical sequence.
Include at least eight activities for the required critical path analysis.
8.4 Estimate Activity Durations
Estimate the time required to complete each activity. Explain the assumptions, resource
availability and estimation rationale supporting each duration.
8.5 Develop Schedule
8.5.1 Four-Week Project Schedule
Develop the complete simulated project schedule, assuming the project starts on
November 1. Ensure the schedule covers four weeks, including acceptance and
closure.
8.5.2 Gantt Chart
Prepare a Gantt chart displaying activities, durations, start and finish dates, owners,
dependencies and milestones.
8.5.3 Forward Pass
Calculate Early Start (ES) and Early Finish (EF) for each relevant activity using the
network diagram.
8.5.4 Backward Pass
Calculate Late Start (LS) and Late Finish (LF) for each relevant activity.
8.5.5 Float Calculations
Calculate Free Float (FF) and Total Float (TF) and explain how they indicate scheduling
flexibility.
8.5.6 Critical Path Analysis
Identify the longest path through the network and explain which activities have zero total
float and determine the project's minimum planned duration.
8.6 November 15 Simulated Status Update
Use November 15 as the pre-approved simulated status date. Assume that the project
experienced a two-day delay since November 1. Update the network diagram to reflect
the required status scenario and explain its scheduling implications.
8.7 Schedule Baseline
Present the proposed approved schedule baseline, including the Gantt chart, activity
list, milestones and supporting network analysis. Identify its sponsor review and
approval status.
NO AI SHOULD BE USED, the document will be check for ai detection using turnitin!
8. SCHEDULE MANAGEMENT
Responsible: Schedule Manager
8.1 Plan Schedule Management
Explain the methods and procedures for developing, monitoring and controlling the
project schedule. Define the scheduling approach, reporting frequency, units of
measurement and responsibilities.
8.2 Define Activities
Derive specific project activities from the WBS work packages. Ensure that each activity
represents identifiable work required to complete a work package.
8.2.1 Activity List
Prepare an activity list containing unique IDs, descriptions, assigned owners, durations
and relevant work package references.
8.2.2 Milestone List
Identify important project events and completion points. Include major planning,
development, testing, acceptance and closure milestones within the simulated four-
week project.
8.3 Sequence Activities
Identify the logical relationships and dependencies between project activities. Explain
which activities must precede or follow others.
8.3.1 Activity Dependencies
Document predecessor and successor relationships and identify dependency types
where appropriate.
8.3.2 Activity-on-Node Network Diagram
Develop a network diagram showing all relevant activities and their logical sequence.
Include at least eight activities for the required critical path analysis.
8.4 Estimate Activity Durations
Estimate the time required to complete each activity. Explain the assumptions, resource
availability and estimation rationale supporting each duration.
8.5 Develop Schedule
8.5.1 Four-Week Project Schedule
Develop the complete simulated project schedule, assuming the project starts on
November 1. Ensure the schedule covers four weeks, including acceptance and
closure.
8.5.2 Gantt Chart
Prepare a Gantt chart displaying activities, durations, start and finish dates, owners,
dependencies and milestones.
8.5.3 Forward Pass
Calculate Early Start (ES) and Early Finish (EF) for each relevant activity using the
network diagram.
8.5.4 Backward Pass
Calculate Late Start (LS) and Late Finish (LF) for each relevant activity.
8.5.5 Float Calculations
Calculate Free Float (FF) and Total Float (TF) and explain how they indicate scheduling
flexibility.
8.5.6 Critical Path Analysis
Identify the longest path through the network and explain which activities have zero total
float and determine the project's minimum planned duration.
8.6 November 15 Simulated Status Update
Use November 15 as the pre-approved simulated status date. Assume that the project
experienced a two-day delay since November 1. Update the network diagram to reflect
the required status scenario and explain its scheduling implications.
8.7 Schedule Baseline
Present the proposed approved schedule baseline, including the Gantt chart, activity
list, milestones and supporting network analysis. Identify its sponsor review and
approval status.
Apply on Freelancer →
Project sourced from Freelancer.com. Applications happen directly on the original platform — we never collect your data.