Primavera P6 Detailed Schedule Needed

via Freelancer ·

Budget / Salary$30–250
TypeFreelance project
LocationRemote
Posted2 hours ago
I need a Primavera P6 professional to build a fully resourced, cost-loaded baseline schedule for my GCC-standard installation project covering both street-lighting and traffic-signal works. The programme must go beyond a simple bar chart: every activity has to be broken down by work zone or chainage section, then drilled further to crew and inspection-step level so that progress and quality hold points are crystal clear.

You will receive the complete BOQ together with my QS report of all ITP checkpoints. From these, develop the WBS, assign labour, plant and material resources, and load the corresponding direct costs so that the schedule rolls up accurately to the contract totals. The final baseline should include calendars, critical path analysis, resource histograms, cash-flow curves and an executive narrative describing your logic and assumptions.

Deliverables
• Primavera P6 baseline (.xer and matching .plf layout)
• PDF printouts of time schedule, resource histogram and cash-flow curve
• Schedule narrative highlighting calendars, constraints, and critical path logic

Acceptance criteria
• 100 % of BOQ scope reflected in the WBS
• Activities grouped by work zone/chainage section with crew and inspection steps visible
• Resources and costs reconcile with supplied BOQ totals
• No open ends, negative lags, or circular logic; DCMA score
project management project scheduling time management project planning construction management contract management
Apply on Freelancer →

Project sourced from Freelancer.com. Applications happen directly on the original platform — we never collect your data.