Experienced Construction Planner Required – Full Podium Construction Programme (MS Project)

I am looking for an experienced construction planner or project engineer to develop a comprehensive construction programme for the entirety of the podium works on an ongoing commercial construction project in Australia.

The project consists of two multi-storey commercial buildings (C3 and C4), with podium works surrounding and connecting both buildings. C4 is currently progressing ahead of C3, which must be considered when developing the construction sequence.

Scope of Work:

Develop a full, detailed podium construction programme from commencement through to completion.

Review the master target programme, current construction programme, architectural drawings and site progress photographs.

Independently identify all activities required to complete the podium works.

Break down the programme into logical construction zones and work fronts.

Determine realistic commencement dates, activity durations and completion dates.

Consider scaffolding removal, access restrictions, logistics and interfaces with both buildings.

Identify opportunities to commence podium works earlier and undertake activities concurrently where practical.

Incorporate all relevant civil, structural, waterproofing, services, drainage, external finishes, paving and landscaping works.

Establish logical predecessors, successors and construction dependencies.

Ensure the podium programme aligns with the master target programme and actual site progress.

Replicate the formatting and structure of an existing basement construction programme that will be provided as a reference.

Exclude unrelated building activities and unnecessary handover milestones.

Documentation Provided:

Master target construction programme.

Current construction lookahead programme.

Existing basement construction programme as a template.

Architectural and relevant construction drawings.

Current site progress photographs.

Information regarding completed and ongoing works.

Deliverable:

One comprehensive, fully editable Microsoft Project (.mpp) file, including:

Detailed work breakdown structure.

Construction activities separated by zone where appropriate.

Realistic activity durations.

Start and finish dates.

Predecessors and successors.

Logical construction sequencing.

Professionally formatted Gantt chart.

Required Experience:

Advanced Microsoft Project proficiency.

Commercial construction planning and programming experience.

Strong understanding of construction methodology and sequencing.

Experience with podium and external construction works.

Ability to independently review and interpret construction drawings.

Australian construction industry experience is highly preferred.

I require someone who can independently develop a complete and practical construction programme, rather than simply populate Microsoft Project with generic activities. The programme will be used to manage and coordinate actual construction works on site.

This is an urgent requirement. Please provide examples of previous construction programmes, relevant experience, proposed fee and earliest available turnaround time.

All project documentation must remain strictly confidential.