Industrial Data Diode Development
Budget / Salary$750–1,500
TypeFreelance project
LocationRemote
Posted1 hour ago
Needed is a purpose-built data diode that can move live sensor information from operational technology (OT) networks to an IT-side monitoring zone without allowing a single bit of traffic back. The stream will carry data coming simultaneously from factory machines, power-water infrastructure, and building-automation sensors, so the solution has to tolerate mixed industrial protocols and a steady, continuous throughput. Some optical technology or another suitable suggested & approved by us may be used.
Core expectations
• One-way hardware or hardened appliance that physically enforces the TX-only path
• Interface options for common field protocols (Ethernet/ip, Profinet-iso tcp, with future pluggable protocol modules anticipated) so we can integrate each equipment class easily
• Configuration utilities or scripts to map multiple sensor, tags, channels, validate packet integrity, and log transfer status on the receive side
• Latency low enough for near-real-time dashboards; no backchannel acknowledgments permitted
• Complete build documentation (KiCad, MS Word): schematic, Gerber files, bill of materials, firmware or , enclosure layout, and an operator guide focusing on installation , user, maintenance editable manuals. A anti-tempering device for the enclosure will be included. 24VDC power in controlled environment.
The attachment provides a better visual picture of our needs.
The orange section of the attached presentation covers hardware.
Green section of the presentation covers OS agnostic software. Embedded webserver for status, diags, configuration desirable with secure log in.
Blue section is not in your scope and will only be used for testing.
Initial testing can be performed on a test system from you; final testing will be with our SCADA and PLC systems (blue section).
Acceptance criteria :
The final unit must pass a loop-break test that proves zero reverse connectivity, successfully forward at least 10 Mbps of mixed sensor traffic for eight consecutive hours, and survive a 48-hour temperature-and-vibration soak aligned with standard industrial tolerances. Pentesting tools will be used & provided. Include a single HW unit for you & 1 for us during collateral testing. The unit you will use will be sent to us before the milestone 2 is released.
Please outline your proposed architecture, any previous experience with unidirectional gateways, technology used with justification or critical-infrastructure security.
Any software tools used will be included in your bid & will become our sole property (with the rest of the solution) with no encumbrances or strings attached. Use of subscription services is discouraged.
The budget given is placeholder only, your bid must be final with amount & delivery time.
No upfront. A 1st milestone will be created after a acceptable remote demo is shown. 50% payment for milestone 1 after acceptable solution is delivered. 25% after job done. Final 25% payment will be after system delivery is with us for 2 months evaluation without any issues. Payment made only after all source code & support docs are delivered to us & approved for that milestone.
Respond only after reading full JD. Submit questions, changes, ideas with 1st response only. No changes allowed to your response till after award acceptance. The person responding will be the person doing the job. Any submissions must be done after full testing by you. Include items not tested & known issues. Only 1 testing session will be done by us before a final test by our team. Do not use any AI or BOT assistance in your communications with us. Those will be treated as fake, go in your disfavor & action taken. Please save yours & our time - do not bid, if you do not like our terms.
Core expectations
• One-way hardware or hardened appliance that physically enforces the TX-only path
• Interface options for common field protocols (Ethernet/ip, Profinet-iso tcp, with future pluggable protocol modules anticipated) so we can integrate each equipment class easily
• Configuration utilities or scripts to map multiple sensor, tags, channels, validate packet integrity, and log transfer status on the receive side
• Latency low enough for near-real-time dashboards; no backchannel acknowledgments permitted
• Complete build documentation (KiCad, MS Word): schematic, Gerber files, bill of materials, firmware or , enclosure layout, and an operator guide focusing on installation , user, maintenance editable manuals. A anti-tempering device for the enclosure will be included. 24VDC power in controlled environment.
The attachment provides a better visual picture of our needs.
The orange section of the attached presentation covers hardware.
Green section of the presentation covers OS agnostic software. Embedded webserver for status, diags, configuration desirable with secure log in.
Blue section is not in your scope and will only be used for testing.
Initial testing can be performed on a test system from you; final testing will be with our SCADA and PLC systems (blue section).
Acceptance criteria :
The final unit must pass a loop-break test that proves zero reverse connectivity, successfully forward at least 10 Mbps of mixed sensor traffic for eight consecutive hours, and survive a 48-hour temperature-and-vibration soak aligned with standard industrial tolerances. Pentesting tools will be used & provided. Include a single HW unit for you & 1 for us during collateral testing. The unit you will use will be sent to us before the milestone 2 is released.
Please outline your proposed architecture, any previous experience with unidirectional gateways, technology used with justification or critical-infrastructure security.
Any software tools used will be included in your bid & will become our sole property (with the rest of the solution) with no encumbrances or strings attached. Use of subscription services is discouraged.
The budget given is placeholder only, your bid must be final with amount & delivery time.
No upfront. A 1st milestone will be created after a acceptable remote demo is shown. 50% payment for milestone 1 after acceptable solution is delivered. 25% after job done. Final 25% payment will be after system delivery is with us for 2 months evaluation without any issues. Payment made only after all source code & support docs are delivered to us & approved for that milestone.
Respond only after reading full JD. Submit questions, changes, ideas with 1st response only. No changes allowed to your response till after award acceptance. The person responding will be the person doing the job. Any submissions must be done after full testing by you. Include items not tested & known issues. Only 1 testing session will be done by us before a final test by our team. Do not use any AI or BOT assistance in your communications with us. Those will be treated as fake, go in your disfavor & action taken. Please save yours & our time - do not bid, if you do not like our terms.
Apply on Freelancer →
Project sourced from Freelancer.com. Applications happen directly on the original platform — we never collect your data.