High-Efficiency AIKO Solar Upgrade -- 2
Budget / SalaryHourly project
TypeFreelance project
LocationRemote
Posted3 hours ago
My small UK business is ready to move to an AIKO ABC solar array and I need a specialist who can take me from concept to switch-on. Above all, I value peak efficiency and performance, so every recommendation must squeeze the maximum kWh out of limited roof space while keeping operating temperatures low.
Scope of work
• Bespoke system design: size the array, optimise panel layout, and model annual generation using the latest UK irradiance data.
• Equipment specification: AIKO panels are my first choice, but please show comparative numbers for JA Solar so I can see the trade-offs. Pair the array with a smart inverter (we currently favour SolarEdge, Sigenergy or Solis) and add battery storage to capture excess daytime production.
• Warranty alignment: 25-year manufacturer cover on modules, up to 30-year performance guarantee, and at least 10-year inverter protection must be locked in.
• Installation & commissioning: manage mounting, cabling, grid connection paperwork (G99 where required), and deliver full sign-off with MCS documentation.
• Monitoring & handover: set up remote monitoring so I can track production and battery state of charge from my phone.
Acceptance criteria
1. Final proposal shows predicted annual yield, ROI, and payback calculations.
2. All components match or exceed the warranty periods listed above.
3. System passes DNO approval and produces the first export reading without fault.
If you have a proven track record deploying high-efficiency commercial systems in the UK and can demonstrate projects using AIKO or equivalent top-tier panels, I’d love to see your plan.
Scope of work
• Bespoke system design: size the array, optimise panel layout, and model annual generation using the latest UK irradiance data.
• Equipment specification: AIKO panels are my first choice, but please show comparative numbers for JA Solar so I can see the trade-offs. Pair the array with a smart inverter (we currently favour SolarEdge, Sigenergy or Solis) and add battery storage to capture excess daytime production.
• Warranty alignment: 25-year manufacturer cover on modules, up to 30-year performance guarantee, and at least 10-year inverter protection must be locked in.
• Installation & commissioning: manage mounting, cabling, grid connection paperwork (G99 where required), and deliver full sign-off with MCS documentation.
• Monitoring & handover: set up remote monitoring so I can track production and battery state of charge from my phone.
Acceptance criteria
1. Final proposal shows predicted annual yield, ROI, and payback calculations.
2. All components match or exceed the warranty periods listed above.
3. System passes DNO approval and produces the first export reading without fault.
If you have a proven track record deploying high-efficiency commercial systems in the UK and can demonstrate projects using AIKO or equivalent top-tier panels, I’d love to see your plan.
Apply on Freelancer →
Project sourced from Freelancer.com. Applications happen directly on the original platform — we never collect your data.