Florida Balcony and Walkway/Stair Railing Repair/Replacement Calcs and Plans
Budget / Salary$750–1,500
TypeFreelance project
LocationRemote
Posted1 hour ago
Need Structural Repair Drawings and needed structural repair calcs to do the following.
ONLY BID AFTER REVIEWING IMAGES OF THE CONCRETE SLAB, RAILING DAMAGES.
Do NOT BID IF YOU DON'T HAVE A PORTFOLIO of simlar work in USA.
Project located in Florida with with speeds at 139MPH zone. FBC 2023, ASCE-7-22 Wind Loads. Balcony and walkway railing must comply with FBC 2023 requirements.
Existing second floor walkway railing are wooden with delamination and damage, so must be replaced in full or partial.
Stairs railing are metal with moderate corrosion, so must be repalced.
Seconf floor balconies show some corrosion damage to the long span bars, cracked and spalling concrete for balcony slab, and support beam. Partition CMU balcony walls also show corroded vertical rebar, need repairs and waterproofing details.
Second floor concrete balconies with minor repairs, some longitudnal rebar show minor corrosion.
Second floor balconies existing wood railing replacement with SYP wood railing per FBC 2023.
Stairs railing replacement drawings from first to second floor walkway design and drawings.
The building is apartment building with CMU construction, concrete foundation and floor slabs, wood roof frmaing for main building. NO REPAIRS NEEDED TO MAIN BUILDING.
Structural calculations for repairs and/or replacement for walkway and stair railings with drawings needed.
Calcs for balcony slab/cantilever beams corroded rebars with complete details needed.
Must have concrete, wood, metal stair railing repair, retrofit and replacement experience in USA.
Shall be a P.E , who can possibly sign his own calcs, and drawings.
Time available 2 weeks.
ONLY BID AFTER REVIEWING IMAGES OF THE CONCRETE SLAB, RAILING DAMAGES.
Do NOT BID IF YOU DON'T HAVE A PORTFOLIO of simlar work in USA.
Project located in Florida with with speeds at 139MPH zone. FBC 2023, ASCE-7-22 Wind Loads. Balcony and walkway railing must comply with FBC 2023 requirements.
Existing second floor walkway railing are wooden with delamination and damage, so must be replaced in full or partial.
Stairs railing are metal with moderate corrosion, so must be repalced.
Seconf floor balconies show some corrosion damage to the long span bars, cracked and spalling concrete for balcony slab, and support beam. Partition CMU balcony walls also show corroded vertical rebar, need repairs and waterproofing details.
Second floor concrete balconies with minor repairs, some longitudnal rebar show minor corrosion.
Second floor balconies existing wood railing replacement with SYP wood railing per FBC 2023.
Stairs railing replacement drawings from first to second floor walkway design and drawings.
The building is apartment building with CMU construction, concrete foundation and floor slabs, wood roof frmaing for main building. NO REPAIRS NEEDED TO MAIN BUILDING.
Structural calculations for repairs and/or replacement for walkway and stair railings with drawings needed.
Calcs for balcony slab/cantilever beams corroded rebars with complete details needed.
Must have concrete, wood, metal stair railing repair, retrofit and replacement experience in USA.
Shall be a P.E , who can possibly sign his own calcs, and drawings.
Time available 2 weeks.
Apply on Freelancer →
Project sourced from Freelancer.com. Applications happen directly on the original platform — we never collect your data.