Finish Seismic Cable Tray Submittal

via Freelancer ·

Budget / Salary$750–1,500
TypeFreelance project
LocationRemote
Posted12 hours ago
I have an installed cable-tray system that failed its first submittal review and now carries a “Revise & Resubmit” status. All reviewer comments point to three areas that must be strengthened:

• Seismic calculations need deeper or corrected analysis
• Bracing layout and connection details must be refined
• Responses, drawings, and supporting documents have to be clearer and better organized

Everything you will need is on hand: the full comment set, the original submittal, tray drawings showing sizes, runs, supports, plus the project’s seismic design criteria and approved structural sheets. The scope covers the entire cable-tray network, so your calculations and details must treat every run, riser, and support.

What I need from you:

1. Updated seismic attachment & bracing calculations that satisfy California Building Code requirements for non-structural components.
2. Revised bracing and connection details ready for inclusion in the submittal package (AutoCAD or Revit native files preferred, PDFs required).
3. A point-by-point written response to each reviewer comment, cross-referenced to the new sheets or calculations.
4. California PE stamp and signature on the calculations, details, and response letter.

I have attached several things for you to review in order to provide a quote.

-Submittal 130 is the current submittal with the revise and resubmit status that needs to be completed.
-Submittal 73 is the initial material submittal for the cable tray that is referenced in submittal 130 and was used to install the cable tray.
- Cable tray as installed is a drawing of the as-installed tray, notating total weights per linear foot at various locations around the installation. Photos are also included in this file.
- Sub 130A Connection Details Simplified is a file of drawings detailing the various types of connections that were used in the installation.
- The Koch & Koch Inc. mail is an email thread with Nucor, who is the metal building manufacturer. This is confirmation that the purlins can support loads of 200 lbs. vertically and 100 lbs. laterally.

Delivery is complete when the package is approved by the AHJ and meets typical plan-check acceptance: no open seismic questions, clearly coordinated tray and brace locations, and fully sealed documents. I will answer site-specific questions promptly and can provide additional photos or field measurements if they help close out this work swiftly.