Cleanroom CFD Airflow Optimization

via Freelancer ·

Budget / Salary2,000–7,000 SGD
TypeFreelance project
LocationRemote
Posted2 hours ago
CFD Simulation and Airflow
Optimization for Cleanroom 1A and 2A
Computational Fluid Dynamics Study • Cleanroom 1A (3,450 m²) • Cleanroom 2A (1,000 m²)

TYPE
TOTAL AREA
DURATION
BUDGET

1. Project Overview
We require a detailed Computational Fluid Dynamics (CFD) study for two cleanrooms only: Cleanroom 1A and Cleanroom 2A. No other areas are in scope.
The goal is to validate and optimize temperature uniformity, humidity control, airflow distribution, and return air performance before final design freeze and commissioning.
The system uses a combination of AHU supply air, FFU array, return air chase, and dry coils. The CFD must model the interaction between all four, not each in isolation.
2. Scope of Work
Scope is strictly limited to the two cleanrooms below. Out of scope: all other cleanrooms, corridors, sub-fab, and mechanical rooms, unless they directly affect return air or plenum pressure for 1A / 2A.
Cleanroom
Area
Scope

Cleanroom 1A
3,450 m²
Full CFD model, analysis, and recommendations

Cleanroom 2A
1,000 m²
Full CFD model, analysis, and recommendations

3. Key Parameters to Model
The simulation must explicitly include these four inputs. Proposals that do not address all four will not be considered.
3.1 Return Air Temperature
Distribution: Model return air temperature distribution across the cleanroom and at each return air inlet.
Stratification: Assess stratification, hot spots, and temperature rise from process heat loads.
AHU return: Predict return air temperature back to the AHU under design and partial load conditions.
Load impact: Quantify impact on cooling load and AHU energy.
3.2 Location of Return Air Chase and Dry Coil
Chase and coil location: Model the proposed location(s) of the return air chase and dry coil(s).
Pressure and capture: Evaluate pressure drop, airflow short-circuiting, and uniformity of return air capture.
Dry coil duty: Assess dry coil performance for sensible cooling and temperature trim without condensation.
Optimization: Recommend optimized location, sizing, or relocation if the current layout creates dead zones, recirculation, or uneven return.
3.3 Direct Supply Air Diffuser Location Above Plenum
AHU condition: AHU with 8 °C coil, providing both cooling and dehumidification.
Plenum and diffusers: Model supply air plenum above the ceiling and all direct supply air diffusers fed by the AHU.
Psychrometrics: Model supply air temperature, humidity ratio, and dew point after the 8 °C coil.
Diffuser performance: Evaluate diffuser throw, plenum pressure uniformity, velocity at working plane, and interaction with FFU flow.
Risk check: Identify over-cooling, condensation risk, or humidity non-uniformity.
3.4 All FFU Locations and Flow Rates
Every FFU: Model every FFU by its exact location and rated flow rate / face velocity from the FFU schedule.
Scenarios: Include FFU on/off scenarios and turndown if applicable.
Coverage: Evaluate coverage, overlapping flows, downward velocity uniformity, and turbulence at process level.
Interaction: Evaluate interaction between FFU downflow, AHU diffuser supply, and return air chase.
4. Analysis Required
Steady-state + partial load: Steady-state simulation at full design load, plus at least one partial load / standby scenario.

Humidity: Relative humidity / humidity ratio distribution resulting from the 8 °C coil dehumidification.
Airflow: Velocity vectors, streamlines, and air change effectiveness.
Problem zones: Identification of dead zones, recirculation zones, short-circuiting, and hot spots.
Pressure profile: Pressure across plenum, cleanroom, return chase, and dry coil.
Quality checks: Mesh independence study and convergence report.
Sensitivity check: What happens if FFU flow varies by +/- 10%, or if one return chase is blocked / one dry coil is off?
5. Deliverables
1. CFD Report (PDF): Methodology, assumptions, boundary conditions, mesh study, results, and clear design recommendations.
2. Contour and Vector Plots: Temperature, humidity, velocity, and pressure for 1A and 2A, plan and section views.
3. Streamline / Animation: Airflow path from supply diffusers and FFUs to return chase.
4. Summary Table: Predicted temperature uniformity, max/min temperature at working plane, return air temperature, RH range, and velocity uniformity for each cleanroom.
5. Recommendations: Specific changes to diffuser location, return chase location, dry coil location, or FFU flow rates if targets are not met.
6. Native Case Files: [ANSYS Fluent / CFX / OpenFOAM / Star-CCM+ - specify your software] with all boundary conditions, so we can rerun or audit.
6. Inputs We Will Provide
Architectural and HVAC layout drawings for 1A and 2A (CAD / PDF / Revit if available)
Ceiling plan with FFU layout and FFU schedule with flow rate per unit
AHU schedule, including 8 °C coil specs, supply air flow rate, supply temperature, and dehumidification duty
Diffuser schedule, location, and throw data
Return air chase and dry coil drawings and specs
Internal heat loads: equipment, lighting, personnel, process tools
Target conditions: [e.g. Temp 22 °C +/- 1 °C, RH 45% +/- 5%, Cleanroom Class ISO 6, Velocity 0.3 to 0.45 m/s - to be confirmed]
Plenum height, ceiling height, and floor layout
7. Freelancer Requirements
Proven experience in cleanroom CFD, preferably semiconductor, pharma, battery, or microelectronics facilities
Expert in ANSYS Fluent, CFX, Star-CCM+, or OpenFOAM, with examples of similar cleanroom projects
Strong understanding of AHU psychrometrics, dehumidification with chilled water coil, FFU systems, and dry coil operation
Able to work from CAD / Revit and FFU schedules
Able to sign NDA before receiving detailed drawings
clean technology simulation computational fluid dynamics
Apply on Freelancer →

Project sourced from Freelancer.com. Applications happen directly on the original platform — we never collect your data.